RAF Wittering

Main Runway & AGL Refurbishment

Value: £35 million

Client: Defence Infrastructure Organisation (DIO)

Location: Cambridgeshire, United Kingdom

Lagan Aviation & Infrastructure successfully delivered the refurbishment of the main runway and Airfield Ground Lighting (AGL) at RAF Wittering. This project was undertaken as part of the Airfield Operating Surfaces (AOS) Framework for Defence Infrastructure Organisation (DIO). The AOS Framework is a programmatic approach to improve the whole-life management of critical airfield infrastructure assets across the UK defence estate.

The refurbishment involved large‑scale reconstruction and resurfacing works across runways, taxiways and associated operating surfaces. With 90,000 tonnes of asphalt and 6,000 m³ of PQC concrete required, early logistical planning was essential. As part of our self‑delivery model, we established on‑site asphalt and concrete batching plants to ensure reliability of materials supply, programme certainty and reduced vehicle movements around active airfield zones.

Our team collaborated closely with RAF Wittering to identify construction areas that would allow flying operations to continue safely throughout. Early phasing workshops enabled us to shift operations from the main runway to the northern taxiway, providing the RAF with a fully completed and operational surface before progressing to subsequent phases.

RAF representatives praised Lagan’s flexibility and bespoke approach, noting that our team tailored the programme around RAF Wittering’s unique operational needs.

Key Achievements

  • Delivery of 90,000 t asphalt and 6,000 m³ PQC concrete in a live military environment

  • On‑site batching plants ensured programme control

  • Successful relocation of flying operations to maintain capability

  • Fully coordinated phased programme developed with RAF and DIO

  • Self‑delivered airfield surfacing, logistics and materials production

Next
Next

London Stansted Airport - Runway Rehabilitation